Cablegate: Goj Response to Blue Lantern: Post-Shipment
VZCZCXRO8189
PP RUEHFK RUEHKSO RUEHNAG RUEHNH
DE RUEHKO #3436 3520835
ZNR UUUUU ZZH
P 170835Z DEC 08
FM AMEMBASSY TOKYO
TO RUEHC/SECSTATE WASHDC PRIORITY 9536
INFO RUEHBJ/AMEMBASSY BEIJING PRIORITY 6881
RUEHBY/AMEMBASSY CANBERRA PRIORITY 2945
RUEHUL/AMEMBASSY SEOUL PRIORITY 2882
RUEHGP/AMEMBASSY SINGAPORE PRIORITY 7292
RUEHFK/AMCONSUL FUKUOKA PRIORITY 1488
RUEHNAG/AMCONSUL NAGOYA PRIORITY 9450
RUEHKSO/AMCONSUL SAPPORO PRIORITY 2054
RUEHOK/AMCONSUL OSAKA KOBE PRIORITY 5279
RUEHNH/AMCONSUL NAHA PRIORITY 3845
RUEHIN/AIT TAIPEI PRIORITY 7218
RUCPDOC/DEPT OF COMMERCE WASHINGTON DC PRIORITY
UNCLAS TOKYO 003436
SENSITIVE
SIPDIS
STATE FOR PM/DTCC BLUE LANTERN COORDINATOR
E.O. 12958: N/A
TAGS: ETTC ETRD ECON KOMC JA
SUBJECT: GOJ RESPONSE TO BLUE LANTERN: POST-SHIPMENT
END-USE LICENSE CHECK 050110498
REF: STATE 120156
1. (SBU) Ministry of Defense Bureau of Finance and Equipment,
Equipment Policy Division Deputy Director Takeshi Kawamura
confirmed the details of the order of 20 Model QA-700
accelerometers (Honeywell Part No. 979-0704-001 IAI Part No.
1321.1080.00.00). The DOD ordered 10 Azimoth Indicators
under a FY 2007 Contract Number 20314 between Mitsubishi
Heavy Industry and Japan Air Self Defense Force (JASDF).
Delivery is due February 27, 2009. Each of the 10 Azimoth
Indicators requires two accelerometers, which totals the 20
ordered from the U.S.
2. (SBU) As of December 9, JASDF has not received any of the
accelerometers, as the manufacturing process is still
incomplete. During manufacturing, the articles pass through
a value-added process that includes Honeywell International,
Israel Aerospace Industries, Hitachi Ltd. (Totsuka Plant),
and Mitsubishi Heavy Industry (Nagoya Plant), after which
they arrive at JASDF. Currently, fourteen articles are at
the Hitachi's Totsuka Plant, and six are at Israel Aerospace
Industries Ltd.
ZUMWALT