Ready-mixed concrete production recovered to high levels in the September 2020 quarter, after falling sharply in the
June quarter, Stats NZ said today.
“Quarterly production of concrete was back above 1 million cubic metres in the latest quarter, close to peak levels seen
last year,” acting construction statistics manager Bryan Downes said.
“Construction picked up again after the temporary shut-down during the COVID-19 alert level 4 lockdown in the June
quarter.”
Visit our website to read this news story and access Infoshare tables:
Concrete sets solid foundation for recoveryReady-mixed concrete secondary production (SEP): September 2020 quarter – Infoshare tables