TrustPower Limited First Quarter Operating Results
Market Announcement
Friday, 3 August
2012
TrustPower Limited First Quarter Operating Results for the Three Months Ended 30 June 2012
TrustPower’s operating statistics for the quarter ended 30 June 2012 together with prior period comparatives are provided at the end of this announcement.
The first quarter of the 2013 financial year has seen higher than average wholesale electricity prices due to below average hydro storage levels and inflows across the country.
TrustPower’s New Zealand generation production was 604GWh in the first quarter, 14 per cent below same period last year but less than 2 per cent below expected long term average production, reflecting very strong hydro production in prior period. Wind production for the quarter at the Tararua and Mahinerangi wind farms was in line with prior period.
New Zealand hydro storage levels have improved during July and wholesale electricity prices have fallen as a result.
The Snowtown Stage 1 Wind
Farm produced 89GWh during the first quarter which was 6 per
cent up on prior period and slightly above long term
expectation.
Mass market customer sales were down 5 per
cent for the first quarter compared to prior period
predominantly due to lower customer numbers. Time of Use
sales were down 30GWh (5 per cent) on prior period.
However, TrustPower sold 35GWh more volume through the ASX
during the quarter than prior period as this was determined
to be the best product placement channel given high
wholesale electricity prices. Mass market competition
remains strong although a moderation in customer churn has
been experienced during the quarter with customer numbers
reducing by 1,000 since 31 March 2012.
The 3.8MW hydro project at Esk Valley in the Hawkes Bay is progressing well towards target commissioning in June 2013. The decision to proceed with the 2.6MW residual flow project at the existing Arnold hydro scheme has been delayed as project economics remain under review.
Announcements in relation to financial close of the 270MW Snowtown Stage 2 development were made last week. Notice to proceed under the Engineering, Procurement and Construction Contract with Siemens Ltd has been issued by TrustPower during this week and funding arrangements are in the process of being signed.
A simplified disclosure prospectus for an offer of 7 year unsecured subordinated bonds has been registered. The indicative interest rate for the offer is 6.75 – 7.0% with a final interest rate (which may be outside this indicative rate range) to be determined and announced by TrustPower through NZX on or prior to the offer opening date, following a book build process with market participants. Proceeds from the offer will be utilised to refinance an existing subordinated bond maturing on 14 September 2012 and for general corporate purposes.
While it is too early to make predictions with respect to TrustPower’s full year trading result the Directors are satisfied with the Company’s year-to-date trading performance.
BJ
HARKER
CHAIRMAN
3 Months 3
Months 12
Months
Operating Statistics
June 2012 June
2011 March 2012
Electricity
customer numbers (000's) 208 220
209
Telecommunication services provided (000's)
38 35 38
Mass
market sales (GWh) 432 455
1,761
Time of use sales (GWh) 541
571 2,199
Total customer sales
(GWh) 973
1,026 3,960
Average
spot price of electricity purchased ($/MWh) 127
45 78
North
Island hydro generation production (GWh) 182
277 922
South Island hydro generation
production (GWh) 266 271
1,012
Total hydro generation production (GWh)
448 548 1,933
North Island wind
generation production (GWh) 131 133
548
South Island wind generation production (GWh)
25 24 100
Total wind generation
production (GWh) 156 157
648
Total New Zealand generation production
(GWh) 604
705 2,582
Average
spot price of electricity generated ($/MWh) 135
42 72
Australian wind generation production (GWh) 89 84 376
Resource consent non-compliance events
4 4 10
Staff numbers (full
time equivalents) 463 439
458