Scoop has an Ethical Paywall
Licence needed for work use Learn More

Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Restoration of native ecology on Ōhuiarangi begins

Media Release

2 April 2019

Restoration of native ecology on Ōhuiarangi / Pigeon Mountain begins

Work starts this month on a programme to restore native vegetation and habitat for native wildlife on Ōhuiarangi / Pigeon Mountain in Half Moon Bay.

Around 112 exotic trees, including pest species, will be removed and over 30,000 new native shrubs and trees will be planted in selected locations.

The maunga became known as Pigeon Mountain in early European times for the numerous Kereru or native pigeon that lived on the maunga, and the planting programme will include tree and plant species that are hoped will encourage Kereru back to the maunga in the future.

From 8 April arborists will begin the tree removal, which is expected to take around twenty days to complete. From May to August this year 500 native shrubs will be planted on the tihi (summit) terraces and another 1200 native shrubs and trees around the quarry slope areas of the maunga. Some of the 30,000 new native shrubs and trees being added around the wetland ecological area on the western side of Pigeon Mountain Road will be planted this Autumn, and the remaining over 2020-2021.

Paul Majurey, Chair of the Tūpuna Maunga Authority says that re-establishing indigenous flora and fauna and restoring the authenticity of the historic maunga sites across Tāmaki Makaurau is a long-term goal.

“Native vegetation is one of the natural features of the maunga that has diminished over many decades, replaced by an increasing number of exotic species. This programme of work will have important long-term ecological benefits for the maunga.”

Advertisement - scroll to continue reading

Ōhuiarangi has suffered significantly in other ways, with literally half of the maunga quarried away between the 1950’s and 1970’s. But despite this destruction, some of the original Māori pā (fortified settlement) has survived in the form of historic pā terraces and midden (historic shell deposits).

“This restoration is very much about restoring what we can of the original ecology while also giving prominence to and maintaining historic features,” says Majurey.

No existing native, scheduled or protected trees will be removed.

The new plantings will be carefully positioned to enhance sight lines to and from the tihi (summit). Terrace planting will take a non-dig approach to avoid ground disturbance; native low-growing pōhuehue plants will be positioned on the terrace surface in cotton bags through which root systems can establish in the soil.

The maunga will remain open to visitors throughout the works but people are asked to avoid areas where arborists are working. For three days in mid-April the maunga will be completely closed while a helicopter is assisting tree removals. Signage explaining the project and temporary closures will be at entrance points.

More information about the Tūpuna Maunga Authority, including the Tūpuna Maunga Integrated Management Plan, can be found at www.maunga.nz.

ENDS


© Scoop Media

Advertisement - scroll to continue reading
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

 
 
 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

Featured News Channels


 
 
 
 

Join Our Free Newsletter

Subscribe to Scoop’s 'The Catch Up' our free weekly newsletter sent to your inbox every Monday with stories from across our network.