Scoop has an Ethical Paywall
Licence needed for work use Learn More

Local Govt | National News Video | Parliament Headlines | Politics Headlines | Search

 

Temuka River Bridge repair, north of Timaru

Temuka River Bridge repair, north of Timaru

The NZ Transport Agency is repairing the Temuka River bridge deck joints, north of Timaru, starting next Monday night 14 March, 2016 at 8 pm.

“A single lane will operate from 8pm overnight to 6am weekdays (Monday to Friday) 14 March until Thursday, 24 March. The repair work is weather dependent so wet weather may delay the planned completion date,” said NZ Transport Agency Maintenance Contract Manager John Keenan.

“Works will continue over the following week Tuesday 29 March to Friday 1 April if necessary.”

The Temuka River bridge is 8 km north of Washdyke, on the north side of Timaru.

• Drivers should plan for brief delays of up to 10 minutes.
• Temporary traffic signals will control traffic on the bridge during these works.
• Drivers of over-sized loads will not be able to use the bridge while this work is underway and there is no detour available off State Highway 1. The maximum available lane width will be 2.75 metres.

ENDS

Advertisement - scroll to continue reading

© Scoop Media

Advertisement - scroll to continue reading
 
 
 
Parliament Headlines | Politics Headlines | Regional Headlines

 
 
 
 
 
 
 

LATEST HEADLINES

  • PARLIAMENT
  • POLITICS
  • REGIONAL
 
 

Featured News Channels


 
 
 
 

Join Our Free Newsletter

Subscribe to Scoop’s 'The Catch Up' our free weekly newsletter sent to your inbox every Monday with stories from across our network.