INDEPENDENT NEWS

Toll Systems Project Backgrounder

Published: Wed 15 Sep 2004 03:18 PM
15 September 2004
Toll Systems Project Backgrounder
The project
The Toll Systems Project aims to develop a national strategic approach to the standards that apply to the collection and processing functions of toll transactions for future toll roads throughout New Zealand.
The project will determine the key policies and procedures necessary to implement national standards for tolling systems These will include the appropriate institutional arrangements and systems for collecting toll revenues and managing toll facilities. The project will also determine the policies for addressing key issues such as privacy and violation enforcement.
A five-year timeframe is anticipated for the project, from an initial feasibility study through to its implementation. The timing is intended to ensure the system is established before the completion of the first proposed state highway toll road, under the Land Transport Management Act 2003, the SH1 Northern Motorway extension (ALPURT B2).
Phase I Initial feasibility study to select proposed National Toll Collection System April 2004 (completed)
Phase II(a) Consultation on the project for NLTP funding September 2004 – November 2004
Phase II(b) Development of functional specifications 2004 – 2005
Phase III Detailed functional specifications and procurement 2005 – 2006
Phase IV Detailed design 2007
Phase V Implementation and commissioning By December 2008
Proposed toll system
Transit is proposing a free-flow electronic toll collection system and a nationally integrated toll management system. The national toll management system would also be available to other Road Controlling Authorities (on a transaction fee basis) to provide coordinated management for the collection, processing and enforcement of toll fees for any toll road projects.
An electronic toll collection system would involve vehicles being identified electronically on the toll road for example via a transponder (mounted in the vehicle) or video image, with the toll deducted from an established account or the vehicle owner invoiced later.
A nationally integrated toll management system would provide for economies of scale and efficiencies by avoiding the need for separate toll systems for each toll road. Electronic toll collection offers the greatest benefits in terms of achieving free-flow traffic conditions on toll roads, by minimising inconvenience to road users and reducing safety risks.
It is proposed that customer enquiries, account management, revenue management and enforcement would use the existing infrastructure of the Ministry of Transport in the Transport Registry Centre (TRC). This is administered by the Land Transport Safety Authority (LTSA). The TRC already provides billing and customer service functions and is experienced in enforcement, specifically in relation to Road User Charges and Motor Vehicle Registration and Licensing. Other services required for the functionality of the Toll Systems Project could be provided by the TRC, the private sector or some form of joint venture between the two.
Funding
Transit proposes to seek funding for the investigation and design of the Toll Systems Project under the National Land Transport Programme. This recognises the national benefits of facilitating the development of tolling systems, in accordance with the provisions of the LTMA.
However, the capital costs of the roadside infrastructure for individual toll projects would be funded from the revenue from the tolls on the road.
The capital and ongoing costs of the toll management system for all toll roads would be determined in partnership with the Ministry of Transport, Transfund and other Road Controlling Authorities. Eventually however, with sufficient traffic volumes, the project would become self-funding.
Consultation
The consultation process seeks to understand the views and preferences of stakeholders on Transit’s proposals for an integrated tolling system, in particular:
The proposal to implement free-flow electronic toll collection and an integrated single toll management system The role of the Transport Registry Centre within the toll management system The road user experience.
If the consultation process finds support for this proposal it will be refined, particularly in terms of procedures to implement the system, institutional arrangements for collecting revenues and managing toll facilities, and policies for addressing issues such as privacy and violation enforcement.
Further information and submission forms are available online at www.transit.govt.nz/national_tolls/ “Consultation” or from Transit offices. Further queries can be emailed to tsp@transit.govt.nz
Consultation timeline
September 2004 Commence consultation with those listed under Section 15 of the Land Transport Management Act 2003 using written correspondence and personal meetings as appropriate Public submissions open
18 October 2004 Submission period closes
October/November 2004 Summary of submissions and notification of hearing Hearing(s) held (pursuant to special consultative procedures, Schedule 2, Land Transport Management Act 2003)
November/December 2004 Hearing deliberation and reporting Documentation of consultation process Preparation of submission to Transfund to include the Toll Systems Project in the National Land Transport Programme
ENDS

Next in New Zealand politics

Die In for Palestine Marks ANZAC day
By: Peace Action Wellington
Penny Drops – But What About Seymour And Peters?
By: New Zealand Labour Party
PM Announces Changes To Portfolios
By: New Zealand Government
Just 1 In 6 Oppose ‘Three Strikes’ - Poll
By: Family First New Zealand
Budget Blunder Shows Nicola Willis Could Cut Recovery Funding
By: New Zealand Labour Party
Urgent Changes To System Through First RMA Amendment Bill
By: New Zealand Government
View as: DESKTOP | MOBILE © Scoop Media